De Griete Wind Park The De Griete wind park started operation in 2007 with 2 modern 800 kW Enercon turbines. Previously, for years two wind turbines of approximately the same size had been producing their sustainable kilowatt-hours at exactly the same locations. Application of state-of-the-art technology increased the energy production by no less than 50%.
Annual production: 3,677,000 kWh, equivalent to the energy consumption of 1,080 households | Local authority | Terneuzen | | Wind turbine | Enercon - E48 - 800 kW | | Number of wind turbines | 2 | | Installed capacity | 1,6 MW | | Rotor axis height | 50 metres | | Rotor diameter | 48 metres |

|