De Griete Wind Park

The De Griete wind park started operation in 2007 with 2 modern 800 kW Enercon turbines. Previously, for years two wind turbines of approximately the same size had been producing their sustainable kilowatt-hours at exactly the same locations. Application of state-of-the-art technology increased the energy production by no less than 50%.

Annual production: 3,677,000 kWh, equivalent to the energy consumption of 1,080 households

Local authorityTerneuzen
Wind turbineEnercon - E48 - 800 kW
Number of wind turbines  2
Installed capacity      1,6 MW
Rotor axis height50 metres
Rotor diameter48 metres

Windpark de Griete

 

Terug...
Loading...

Last 3 tweets from raedthuysgroep:

LIDMAATSCHAPPEN

  • http://www.nwea.nl
  • http://www.mvonederland.nl/
  • http://www.wind-energie.de/
  • http://www.platformbioenergie.nl

ADVISEURS

  • http://www.kienhuishoving.nl
  • http://www.akd.nl
  • http://www.loyensloeff.com
  • http://www.kpmg.nl
 
Trefwoorden www.raedthuys.nl | Bio-energie - Biomassa - Duurzame Energie - Groencertificaten - Groene energie - Raedthuys - Schone energie - Wat is windenergie - Windenergie
Windenergie in Nederland - Windmolen - Windmolens - Windturbine - Windturbines